• Home
  • About the Project
    • Sector
    • Stakeholders
    • Partners
  • Media Center
    • Events
    • Exhibitions
    • Publications
    • Press Releases
  • Careers
  • Contact Us
    • Contact Us
    • Registration Form
  • Site Map

HP Cogen-Pak

High Pressure Cogeneration for Sugar Sector in Pakistan

Funded by the
European Union

  • Training and Capacity Building of the Sugar Sector and Technology Providers
    • Events
    • Photos
    • Information Material
  • Improving Access to Finance
    • Events
    • Photos
    • Information Material
  • Development of a Conducive Regulatory Regime
    • Events
    • Photos
    • Information Material

About the Project

The Challenge

Pakistan’s sugar sector has an annual availability of 4.4 million metric tons of bagasse, sugar mill waste. To generate heat and electricity for its energy needs, sugar sector is using inefficient low pressure cogeneration systems, consuming 46% more bagasse compared to high pressure cogeneration (HPC). Adoption of HPC is hampered by high upfront cost, technology risks, low capacity of technology providers, non-responsive financial sector and non-conducive regulatory regime.

The Project

HP Cogen-Pak Project under the EU funded SWITCH-Asia Programme aims to promote export of surplus electrical power to the national grid or to allied industrial units, through replication of high pressure cogeneration technologies in the sugar sector by supporting sugar mills through technology standardization, enabling access to finance, and mobilization of relevant public sector authorities. Following are three components of the project,

Training and Capacity Building of the Sugar Sector and Technology Providers

  • Establishment of a National Bagasse Power Support Cell at PSMA, to offer technical, financial and regulatory assistance to its members,
  • Development of standardized technical specifications based on regional best practices for high pressure equipment design and operation, and preparation of project implementation tender documents based on consultation among technology providers and sugar mills,
  • In-house trainings and capacity building of Technology Providers to develop standardized HPC technology solutions
  • Training of technical staff of sugar mills on standardized design and technology selection,
  • Development of business cases of technology switch to HPC for 70 sugar mills,
  • B2B linkages between local and Indian technology providers of HPC systems. Read More …

Improving Access to Finance

  • Financial risk assessment of bagasse based power projects,
  • Development of toolkits for SBP’s Schemes for Financing Power Plants Using Renewable Power, and the Credit Guarantee
  • Trainings of the 5 major FIs in Pakistan on bagasse based co-generation projects and developed toolkits,
  • Training of sugar mill financial departments on toolkits and CDM
  • Ensuring financial closure for 10 HPC projects,
  • Development of project design document for CDM financing for 10 projects. Read More…

Development of a conducive Regulatory Regime

  • Establishment of Multi-stakeholder platform for bagasse based power systems
  • Conduct policy advocacy among Sugar Sector stakeholders, PPIB, and the DISCOs
  • Conducting Multi-stakeholder consultations on the update and adoption of the upfront tariff for bagasse cogeneration.Read More…

 

Project Outreach

Sugar map


  • Funded by the European Union
  • Important Links

    European Union


    Delegation of the European Union to Pakistan


    International Cooperation and Development


    National Electric Power Regulatory Authority(NEPRA)


    Alternative Energy Development Board(AEDB)


  • Implementation Partners

    IHT


    Sequa gGmbH


    TERI


    PSMA


    • Home

      Home
    • About the Project

      Sector
      Stakeholders
      Partners
    • Media Center

      Event
      Exhibitions & Workshops
      Publication
      Press Releases
    • Contact Us

      Contact Us
      Registration Form
    • Site Map

      Site Map
    This website has been developed with the assistance of the European Union. The contents of this website are the sole responsibility of Project Partners (IHT, PSMA, TERI, Sequa gGmbH) and can in no way be taken to reflect the views of the European Union